Generating SDDs
/fd-sdd FD-001
/fd-sdd reads the approved FD and produces one SDD file per planned component.
Requirements
The FD must have status: approved and reviewed: true. If not, /fd-sdd refuses and directs you to run /fd-review first.
What gets generated
For an FD with 3 planned components, /fd-sdd creates:
.forgia/sdd/FD-001/
├── SDD-001-component-a.md
├── SDD-002-component-b.md
└── SDD-003-integration-wiring.md ← always added automatically
Each SDD is populated with:
- Scope derived from the FD component description
- Interfaces from the FD's interface definitions
- Constraints from the FD's architecture section (language, framework, versions)
- Best practices from the dev-guide and constitution
- Test requirements specific to that component
- Acceptance criteria traceable to the FD's verification section
- Context — pointers to existing files the agent must read first
- Work Log — empty, ready to be filled by the executing agent
The integration wiring SDD
/fd-sdd always appends an integration wiring SDD, even if the FD doesn't list one. This SDD covers:
- Wiring:
pub mod,use, dependency injection registration - Startup path: who calls what, in what order
- E2E test: full flow from the public entry point to the innermost component
This is not optional. History shows that components passing unit tests fail to work together when integration wiring is left implicit.
After generation
Review each generated SDD for completeness:
- Scope should be narrow enough for one agent session
- Interfaces should match between adjacent SDDs
- Acceptance criteria should be objectively verifiable
Then execute: see Executing SDDs.